NewsSpecification

New JIP33 document published: S-753 Battery Energy Storage Systems (BESSs) (IEC) v1.0

IOGP JIP33 has published a new JIP33 Specification document – S-753 Battery Energy Storage Systems (BESSs) (IEC) v1.0

The purpose of the IOGP S-753 specification documents is to define a minimum common set of requirements for the procurement of battery energy storage systems (BESSs) in accordance with IEC TS 62933-3-1, Edition 1.0, 2018-08, Electrical energy storage (EES) systems – Part 3-1: Planning and performance assessment of electrical energy storage systems – General specification, for application in the petroleum and natural gas industries.

The IOGP S-753 specification documents follow a common structure comprising a specification, also known as a technical requirements specification (TRS), a procurement data sheet (PDS), an information requirements specification (IRS) and a quality requirements specification (QRS). These four specification documents, together with the purchase order, define the overall technical specification for procurement.

The specification documents can be downloaded from here.

About JIP33

The International Association of Oil & Gas Producers (IOGP) launched Joint Industry Programme 33 (JIP33) to develop standardized procurement specifications aimed at reducing cost and schedule overruns in capital projects.

To date, JIP33 has published 59 specifications, which have been implemented across more than 200 projects, covering the procurement of over 105,000 items and amounting to a category spend exceeding $5 billion.

Find out more about JIP33

Sign up to the JIP33 mailing list here 

Follow us on LinkedIn

Related Articles

Back to top button