• Mailing list
  • JIP33 is managed by IOGP
  • Menu
JIP33
  • About us
    • JIP33 FAQs
  • JIP33 Industry Events
  • News
  • Get involved
  • Spec library
  • Spec development
  • Contact Us
  • Supplier Network

    News

    IOGP-JIP33 has issued the S-753 - Battery Energy Storage Systems (BESS) (IEC) specification documents for public review. The consultation period runs for 4 weeks and will close on Friday 7th February 2025 at 23:00 GMT.

The purpose of the IOGP S-753 specification documents is to define a minimum common set of requirements
for the procurement of battery energy storage systems (BESSs) in accordance with IEC TS 62933-3-1,
Edition 1.0 2018-08 Electrical energy storage (EES) systems – Part 3-1: Planning and performance
assessment of electrical energy storage systems – General specification, for application in the petroleum and
natural gas industries.

    S-722 Flare Package (API) specification documents launched for public review

    JIP33 is a proven success, delivering cost benefits, shorter lead times, improved quality, and more predictable project outcomes through industry-wide alignment.

    JIP33: Unlocking value through standardised procurement specifications

    We invite you to share your insights by completing this questionnaire, which supports the framing and updates of JIP33 Specification

    Announcement: Call for Feedback – JIP33 Specification Updates and Maintenance Questionnaire

    © Copyright 2026, All Rights Reserved
    Back to top button
    Close
    • X
    • LinkedIn
    • RSS